New record in high-rise concrete pumping at Burj Dubai

Product Related Information

  • 50 years of Putzmeister

    Spectacular records in high-rise concrete pumping (606 m at the Burj Dubai in February 2008) and development of the lar-gest boom for truck-mounted concrete pumps (70 m vertical reach, presented in May 2008) make people stop and listen time and again. These technical milestones are possible due to the company's impressive innovation, high

    GET A QUOTE
  • (PDF) Burj Khalifa - A new high for high- Performance

    The 828 m tall Burj Khalifa dominates the Dubai skyline and is the world's tallest structure by far – the first 586 m of the building is constructed from high-performance reinforced concrete

    GET A QUOTE
  • Burj Khalifa, Dubai Tower - Skyscraper - e-architect

    Jan 08, 2010 · 605 – the vertical height in metres to which concrete was pumped in the construction of Burj Dubai, a world record for concrete pumping. 504 – the distance traveled, or 'rise' in metres of Burj Dubai's main service lift, the most of any elevator. 49 – the number of office floors, including the 12-floor annexure. 57 – the number of

    GET A QUOTE
  • DUBAI | Burj Khalifa (Burj Dubai) | World's Tallest

    May 13, 2008 · Burj Dubai sets new global record in glass panel installation Dubai, UAE; May 12, 2008: Setting new global records in practical engineering and architecture, Burj Dubai, the iconic tower developed by Emaar Properties, has recorded another global first with the installation of glass panels at a height of 512 metres (1,679.76 ft).

    GET A QUOTE
  • Burj Dubai is now second tallest building in the world

    Aug 11, 2010 · Burj Dubai has also set a new world record for vertical concrete pumping for a building, by pumping to over 460 metres (1,509 ft). The previous record was held by Taipei 101 for pumping concrete up to a height of 448 metres (1,470 ft).

    GET A QUOTE
  • Structural Details of Burj Khalifa - Concrete Grade and

    The largest concrete pumps in the world were used to pump concrete to height up to 600 m at a single stage. Two numbers of this type of pump was used. As the temperature of the location (Dubai) is very high, there were chance of cracks due to shrinkage. So, the concrete pouring process was carried out at night at a cooler temperature.

    GET A QUOTE
  • How The Burj Khalifa Was Built? - Complexob7

    Sep 08, 2021 · The pumping of concrete high up the building's core, which required 200 bars of pressure, was also an engineering feat never achieved before the Burj Khalifa. To put the scale of materials in context, simply applying the exterior cladding to the building required the work of around 300 engineers in addition to the construction crew, and broke

    GET A QUOTE
  • Gulf Construction

    Mar 05, 2008 · The piles reach a depth of up to 55 m. In total, 45,000 cu m of concrete was laid at the Burj Dubai for the foundation, including base plate. In the Putzmeister Aichtal Works, the new super high pressure pumps were constructed and delivered by mid-2005 for the imminent high-rise pumping.

    GET A QUOTE
  • Another new pump height record at Burj Dubai - Products

    May 27, 2008 · A new record for concrete pumping has been set at the Burj Dubai, by German manufacturer Putzmeister, narrowly beating an existing record set by the same firm on the same building last year. - Products And Services

    GET A QUOTE
  • New heights reached in concrete pumping - ScienceDirect

    Mar 03, 2010 · Figure 3. Putzmeister pumps on site at the Burj Dubai Tower. A pdf version of this article is available on the right-hand side under 'Downloads''. Back in November 2007 a new world record height of 601 m for pumping concrete was set by a Putzmeister 14000 SHP D super high pressure concrete pump being operated by Unimix on the Burj Dubai Tower in Dubai.

    GET A QUOTE
  • Brundage Bone Concrete Pumping 931 N FM 1936 Odessa, TX

    Brundage-Bone Concrete Pumping | The Contractor's Choice

    GET A QUOTE
  • New heights reached in concrete pumping

    Concrete Pumps Reach Record-Breaking Heights at Burj Khalifa | Pump…

    GET A QUOTE
  • Con-Tech Manufacturing, Inc. - Home | Facebook

    Con-Tech Manufacturing, Inc. September 15 at 8:02 AM ·. Did you know that Con-Tech's Elite Control System has an HYD fan cooling icon with built-in On/Off Override button integrated on screen? #DidYouKnow #Mixers #EliteControlSystem #HYDFan #ConTech #CTMMixers #MadeInUSA. 44.

    GET A QUOTE
  • BE PART OF NEW FLEET MANAGEMENT ENTERING THE …

    May 28, 2021 · Rapid Application Software is looking to partner with a hydrovac company to provide feedback to help adapt its platform for the hydrovac industry.

    GET A QUOTE
  • Burj Khalifa – a new high for high-performance concrete

    May 02, 2010 · The world's tallest structure – the 828 m high Burj Khalifa building in Dubai – has set a new benchmark for engineering super-tall buildings. In particular, it significantly raised the bar for high-performance-concrete construction, with its massive reinforced-concrete core and wings extending nearly 600 m above ground level. This paper describes the how the extreme concreting challenges

    GET A QUOTE
  • New heights reached in concrete pumping

    in concrete pumping In April 2008, a new world record height of 606 m for pumping concrete was set on the Burj Dubai Tower in Dubai. Bryan Orchard looks at the high pressure peristaltic or piston pump technology behind this level of performance and the contribution that it can make to the latest generation of high-rise building projects. B

    GET A QUOTE
  • Burj Khalifa - Six Construct

    Reaching new heights. In the centre of Dubai stands the Burj Khalifa tower (formerly called Burj Dubai), the world's tallest manmade structure. This impressive skyscraper, which reaches up to a record height of 828 m, is the focal point of the 500-acre mega-project 'Downtown Dubai' by Emaar Properties, described as the new heart of Dubai.

    GET A QUOTE
  • Fig 3 Graph showing how pumping pressure increased with

    Fig. 3: Graph showing how pumping pressure increased with height for the Burj Khalifa and the influence of the reduction in compressive strength and maximum coarse aggregate size had on the pumping pressure [3]. dynamic yield stress. This was attributed to the temperature rise of the concrete during pumping and should be taken into account when designing the concrete mix [3].

    GET A QUOTE
  • Burj Khalifa, Dubai Tower - Skyscraper - e-architect

    Jan 08, 2010 · 605 – the vertical height in metres to which concrete was pumped in the construction of Burj Dubai, a world record for concrete pumping. 504 – the distance traveled, or 'rise' in metres of Burj Dubai's main service lift, the most of any elevator. 49 – the number of office floors, including the 12-floor annexure. 57 – the number of

    GET A QUOTE
  • Burj Dubai: World's Tallest Structure

    The world's tallest building Burj Dubai, which was under construction for six years, is scheduled to open on 4 th Jan 2010, Fig. 1. The construction of this 818 m tall, reinforced concrete tower structure, broke several records during its construction. As it is the first time a tower of this height is attempted, a combination of several

    GET A QUOTE